Steel Construction: erect, connect, bolt, weld, crane, fall protection, pipe, ironworker,
Two structural ironworkers, one on scissor lift and one sitting on and tied to steel beam, inspect and discuss splice connection between two wide flange structural steel column sections. Upper, unattached column section is supported by crane cable at its top and held in alignment by bull pins and a bolt to lower column splice plates. Subsequent actions indicate the bolt holes for the second down left side of plate bolt (where left bull pin is inserted) do not line up, and ironworkers decide to increase size of hole in upper column section. Ashley Terrace, Ann Arbor, Michigan April, 2007.
Constructioncranestructuralsteelerectironworkercolumnwide flangebuildingspliceplatebull pinAshley TerraceAnn ArborMichiganApril2007structuresteel erection 9287