Masonry Construction: brick, concrete block, mason, scaffold, mortar, mix, shore, clean, saw

masonry, brick, mortar, scaffold, construction: Hydromobile scaffold, Lull forklift, SkyTrak 8042, Ford truck, Gradall 534D9-45, Case skid-steer, Samsung backhoe, Genie S-80 lift/platform, Stihl saw, Terex forklift,
Read More
Case 1845C skid steer tractor with forklift attachment has broken loose a segment of brick paver street. Depot Street, Ann Arbor, 2004.
21 / 46

Case 1845C skid steer tractor with forklift attachment has broken loose a segment of brick paver street. Depot Street, Ann Arbor, 2004.

masonrydemodemolitionpaverDepot Streetforkliftskid steertractorCase 1845C

  • Case 1845C skid steer tractor with forklift attachment has broken loose a segment of brick paver street. Depot Street, Ann Arbor, 2004.
  • Laborers are manually loading uprooted brick pavers into bucket of Daewoo Mega 250 III front end loader-1. Depot Street, Ann Arbor, 2004.
  • Laborers are manually loading uprooted brick pavers into bucket of Daewoo Mega 250 III front end loader-2. Depot Street, Ann Arbor, 2004.
  • Road construction, masonry construction: Having placed and hand-graded sand base for pavers, workers position string lines to guide placement of pavers on base. Broadway Bridge and Depot Street, Ann Arbor, 2004.
  • Sewer construction, masonry construction: Worker builds drain basin for storm sewer using portland cement mortar and curved concrete blocks. Mortar is mixed in mixer and transported in white plastic bucket (lower left). Worker first uses his hands to take mortar from bucket and place it on concrete block. He then places concrete blocks in mortar. Lastly, he spreads mortar over the inside surface of the drainage basin. A drain basin is where storm water draining from stree (such as through corrugated black plastic flexible tubing) flows into the main storm sewer. Huron Parkway, Ann Arbor, Michigan, 2005.
  • Sewer construction, masonry construction: Worker builds drain basin for storm sewer using portland cement mortar and curved concrete blocks. Mortar is mixed in mixer and transported in white plastic bucket (lower left). Worker first uses his hands to take mortar from bucket and place it on concrete block. He then places concrete blocks in mortar. Lastly, he spreads mortar over the inside surface of the drainage basin. A drain basin is where storm water draining from stree (such as through corrugated black plastic flexible tubing) flows into the main storm sewer. Huron Parkway, Ann Arbor, Michigan, 2005.
  • Sewer construction, masonry construction: Worker builds drain basin for storm sewer using portland cement mortar and curved concrete blocks. Mortar is mixed in mixer and transported in white plastic bucket (lower left). Worker first uses his hands to take mortar from bucket and place it on concrete block. He then places concrete blocks in mortar. Lastly, he spreads mortar over the inside surface of the drainage basin. A drain basin is where storm water draining from stree (such as through corrugated black plastic flexible tubing) flows into the main storm sewer. Huron Parkway, Ann Arbor, Michigan, 2005.
  • Sewer construction, masonry construction: Worker builds drain basin for storm sewer using portland cement mortar and curved concrete blocks. Mortar is mixed in mixer and transported in white plastic bucket (lower left). Worker first uses his hands to take mortar from bucket and place it on concrete block. He then places concrete blocks in mortar. Lastly, he spreads mortar over the inside surface of the drainage basin. A drain basin is where storm water draining from stree (such as through corrugated black plastic flexible tubing) flows into the main storm sewer. Huron Parkway, Ann Arbor, Michigan, 2005.
  • Construction scaffold: Welded steel tubular modular scaffold with wood plank platforms for erecting reinforced concrete block fire walls for building fire stairs.
  • Masonry construction safety bracing: Typical inadequate and unsafe bracing of concrete block walls against wind, on interior of this building: (1) Single nail connections between 2x10 plank members cannot transfer anticipated loads. (2) Stake in soil (#6 rebar here) cannot support anticipated wind load. (3) Lack of connection between vertical plank and masonry prevents transfer of anticipated wind load to bracing system. Ann Arbor, 2004.
  • Masonry construction safety bracing: Typical inadequate and unsafe bracing of concrete block walls against wind, on interior of this building: (1) Single nail connections between 2x10 plank members cannot transfer anticipated loads. (2) Stake in soil (#6 rebar here) cannot support anticipated wind load. (3) Lack of connection between vertical plank and masonry prevents transfer of anticipated wind load to bracing system. Ann Arbor, 2004.
  • Masonry construction safety bracing: Typical inadequate and unsafe bracing of concrete block walls against wind, on interior of this building: (1) Single nail connections between 2x10 plank members cannot transfer anticipated loads. (2) Stake in soil (#6 rebar here) cannot support anticipated wind load. (3) Lack of connection between vertical plank and masonry prevents transfer of anticipated wind load to bracing system. Ann Arbor, 2004.
  • Masonry construction safety bracing: Details of typical inadequate and unsafe bracing of concrete block walls against wind, on interior of this building: (1) Single nail connections between 2x10 plank members cannot transfer anticipated loads. (2) Stake in soil (#6 rebar here) cannot support anticipated wind load. (3) Lack of connection between vertical plank and masonry prevents transfer of anticipated wind load to bracing system. Ann Arbor, 2004.
  • Masonry construction: Terex SS-842 rough terrain hydraulic telescopic boom forklift picks up banded batch of 8"x8"x16" concrete blocks, using the left two tines of its fork. Forklift has 8,000 lb capacity and can reach 25' and lift 42' high. Huron Village Shopping Center, Ann Arbor, 2004.
  • Masonry construction: Terex SS-842 rough terrain hydraulic telescopic boom forklift picks up banded batch of 8"x8"x16" concrete blocks, using the left two tines of its fork. Forklift has 8,000 lb capacity and can reach 25' and lift 42' high. Huron Village Shopping Center, Ann Arbor, 2004.
  • Masonry construction: Welded tubular scaffold, stacked 3 high with cross-bracing, for erection of concrete block exterior wall, to be covered on outside with brick vineer. Left and right sections of scaffold have two open bays without cross-bracing at upper level, to provide access for forklift to place set mortar pan and concrete block material, to be distributed along wall for masons to erect the wall. <br />
<br />
Red racks at left and right provide easy transportation and storage for tubular scaffold sections on or off site. Huron Village Shopping Center, Ann Arbor, Michigan, 2004.
  • Masonry construction safety, fall hazard: Laborer/ hod carrier stands on top of 3 ft high unstable stack of concrete block and 19 ft above ground, leaning out and stacking heavy blocks, with no fall protection from safety line or guardrail. Ann Arbor, 2004.
  • Masonry construction safety, fall hazard: Laborer/ hod carrier stands on top of 6 ft high unstable stack of concrete block and 19 ft above ground, leaning out and stacking heavy blocks, with no fall protection from safety line or guardrail. Ann Arbor, 2004.
  • Masonry construction safety, fall hazard: Laborer/ hod carrier climbs from top of 3 ft high stack of concrete blocks to top of 2 - 2"x10" = 19" wide wood planks 25+ ft above ground, with no fall protection from safety line or guardrail. Ann Arbor, 2004.
  • Masonry construction safety, fall hazard: Laborer/ hod carrier moves concrete block on top of 2 - 2"x10" = 19" wide wood planks 25+ ft above ground, with no fall protection from safety line or guardrail. Ann Arbor, 2004.