My Construction Photos > Champion worker and material construction elevator ready for worker to enter on the 4th floor. Elevator car has gates at each end, one of which slides up and the other slides down, so worker can enter. Here the gates toward building are opened for worker to enter, and the gates away from buildings are closed until car is at bottom and workers leave and enter using the gates at back of car. The two-pulley cathead sits atop elevator tower, with one end of cable attached to car and the other attached to counterweight.
is at bottom, and worker is just opening bottom door to leave car. Elevator counterweight is at top of the mast until car begins its next assent. The two pulley cathead on top of the mast balances the up and down movement of car with the down and up movement of the counterweight. The elevator services floors 3 and up, each of which is fitted with a vertically hinged door that will only open when car is at its floor.  Ashley Terrace, Ann Arbor, Michigan April, 2007.
My Construction Photos > Champion worker and material construction elevator. Elevator car is at bottom, and worker is just opening bottom door to leave car. Elevator counterweight is at top of the mast until car begins its next assent. The two pulley cathead on top of the mast balances the up and down movement of car with the down and up movement of the counterweight. The elevator services floors 3 and up, each of which is fitted with a vertically hinged door that will only open when car is at its floor.  Ashley Terrace, Ann Arbor, Michigan April, 2007.
My Construction Photos > Assembly of Champion worker and material construction elevator assisted by Lorain rough terrain wheel mounted hydraulic telescoping boom mobile crane. In foreground are lattice/truss towers and crane counterweight. In center area are elevator car on left and two pulley cathead somewhat hiddent on right. Along right side are elevator doors to be installed at each floor. Ashley Terrace, Ann Arbor, Michigan April, 2007.
My Construction Photos > Champion worker and material construction elevator ready for worker to enter on the 4th floor. Elevator car has gates at each end, one of which slides up and the other slides down, so worker can enter. Here the gates toward building are opened for worker to enter, and the gates away from buildings are closed until car is at bottom and workers leave and enter using the gates at back of car. The two-pulley cathead sits atop elevator tower, with one end of cable attached to car and the other attached to counterweight.
is at bottom, and worker is just opening bottom door to leave car. Elevator counterweight is at top of the mast until car begins its next assent. The two pulley cathead on top of the mast balances the up and down movement of car with the down and up movement of the counterweight. The elevator services floors 3 and up, each of which is fitted with a vertically hinged door that will only open when car is at its floor.  Ashley Terrace, Ann Arbor, Michigan April, 2007.
My Construction Photos > Champion worker and material construction elevator. Elevator car has ascended to just below 5th floor, and counterweight has descended to 3rd floor. Ashley Terrace, Ann Arbor, Michigan April, 2007.
My Construction Photos > Assembly of Champion worker and material construction elevator assisted by Lorain rough terrain wheel mounted hydraulic telescoping boom mobile crane. In foreground are lattice/truss towers and crane counterweight. In center area are elevator car on left and two pulley cathead somewhat hiddent on right. Along right side are elevator doors to be installed at each floor. Ashley Terrace, Ann Arbor, Michigan April, 2007.
My Construction Photos > Structural steel construction: Tower crane safely moves 2 structural ironworkers in personnel basket from top of structural steel frame to ground during steel erection. Cardiovascular Center, University of Michigan Hospital, Ann Arbor, 2004.
My Construction Photos > Cast in place concrete connection between top of pier and end of precast concrete tie-beam, which allows the tie-beam to act as tension member that ties the tops of the cantilever arched piers together. Woodrow Wilson Bridge replacement, Potomac River between Virginia and Maryland, Capitol Beltway, I-95/I-495. November 2006.
My Construction Photos > Precast concrete top center module/segment/section for bridge pier, with steel reinforcing bars and long steel bolts protruding to be imbedded in cast in place concrete connection between precast concrete tie-beam and top of the pier. This segment is shown in place in other photos. Portions of the sides of the module are corrugated to provide resistance to sliding/shear relative to the modules at its side. In the background are portions of two precast concrete modules from which the piers are constructed. Woodrow Wilson Bridge replacement, Potomac River between Virginia and Maryland, Capitol Beltway, I-95/I-495. November 2006.
Champion worker and material construction elevator ready for worker to enter on the 4th floor. Elevator car has gates at each end, one of which slides up and the other slides down, so worker can enter. Here the gates toward building are opened for worker to enter, and the gates away from buildings are closed until car is at bottom and workers leave and enter using the gates at back of car. The two-pulley cathead sits atop elevator tower, with one end of cable attached to car and the other attached to counterweight.
is at bottom, and worker is just opening bottom door to leave car. Elevator counterweight is at top of the mast until car begins its next assent. The two pulley cathead on top of the mast balances the up and down movement of car with the down and up movement of the counterweight. The elevator services floors 3 and up, each of which is fitted with a vertically hinged door that will only open when car is at its floor. Ashley Terrace, Ann Arbor, Michigan April, 2007.
My Construction Photos > Champion worker and material construction elevator ready for worker to enter on the 4th floor. Elevator car has gates at each end, one of which slides up and the other slides down, so worker can enter. Here the gates toward building are opened for worker to enter, and the gates away from buildings are closed until car is at bottom and workers leave and enter using the gates at back of car. The two-pulley cathead sits atop elevator tower, with one end of cable attached to car and the other attached to counterweight.
is at bottom, and worker is just opening bottom door to leave car. Elevator counterweight is at top of the mast until car begins its next assent. The two pulley cathead on top of the mast balances the up and down movement of car with the down and up movement of the counterweight. The elevator services floors 3 and up, each of which is fitted with a vertically hinged door that will only open when car is at its floor.  Ashley Terrace, Ann Arbor, Michigan April, 2007.
Champion worker and material construction elevator ready for worker to enter on the 4th floor. Elevator car has gates at each end, one of which slides up and the other slides down, so worker can enter. Here the gates toward building are opened for worker to enter, and the gates away from buildings are closed until car is at bottom and workers leave and enter using the gates at back of car. The two-pulley cathead sits atop elevator tower, with one end of cable attached to car and the other attached to counterweight.
is at bottom, and worker is just opening bottom door to leave car. Elevator counterweight is at top of the mast until car begins its next assent. The two pulley cathead on top of the mast balances the up and down movement of car with the down and up movement of the counterweight. The elevator services floors 3 and up, each of which is fitted with a vertically hinged door that will only open when car is at its floor. Ashley Terrace, Ann Arbor, Michigan April, 2007.
See photo in gallery

Comments

|

New comment:

Name: Email: Link:


To foil spammers, enter this code: copy this text in this box: Code unreadable?



All 2,000 large size, high resolution photos, fully captioned and keyword accessible.
Featured Galleries and Collections
Construction Favorites
Construction
Favorites
Earthmoving Slides
Earthmoving
Slides
Construction People
Construction
People
Recent Additions
Recent
Additions
Construction Hazards
Construction
Hazards
Demolition Favorites
Demolition
Favorites
ConExpo 2005
ConExpo 2005
Las Vegas
YMCA
YMCA
Broadway Bridge
Broadway Bridge
Dixboro Bridge
Dixboro Bridge
Woodrow Wilson Bridge
Woodrow Wilson
Bridge
My Construction Photos Users Guide
Site
Users Guide
Earthmoving Cut and Fill
Earthmoving
Cut / Fill
Earthmoving Excavate
Earthmoving
Excavate
Concrete Forms, Reinforcing
Concrete
Forms, Reinforcing
Concrete Mix, Place
Concrete
Mix, Place
Asphalt Pavement
Asphalt
Pavement
Demolition
Demolition
Steel Structure
Steel
Structure
Wood Framing
Wood
Framing
Construction Specialities
Specialties
Piles and Piers
Piles and Piers
Fall Protection
Safety
Fall Protection
Safety: Collapse, Impact
Safety
Collapse, Impact
Earthmoving Cut and Fill
Masonry
Brick, Block
Temporary Support
Scaffold, Shore
Temporary Support
Cranes
Cranes
Trucks
Trucks
Dinosaurs, Prehistoric Animals
Dinosaurs, Pre-
Historic Animals
Fire, Emergency Vehicles
Fire, Emergency
Vehicles
Cars
Cars and Buses
Airplanes
Airplanes
Truck Slides
Truck Slides
Boats
Boats
Trains
Trains
Old Fire Truck Slideshow
Old Fire Truck Slides
Family and Friends
Family and Friends
     


  • Example:
  • Click backhoe for all backhoe photos.
  • Click trench below backhoe for all photos showing both backhoe and trench.

 

Click below for links to other photography web sites.

Member of the Landscape Photographers List, the Architecture Photographers List, and the Digital Photographers List

Photo Top 100

Links to me?

 

You may use the photos on this site free for educational / recreational / "light" commercial use.
That is their purpose. See Use of Photos in Site User Guide


View My Stats