My Construction Photos > Crane moves concrete wall gang form into position. Visual analysis of form structure shows it is pieced together from 8 form panels. Already in place are the opposing side of the forms, reinforcing steel, and form bulkhead. The bulkhead forms a temporary construction joint, against which the next concrete will be placed, after which the bulkhead is removed so the following concrete can be placed against the last concrete placed. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
My Construction Photos > Construction safety, fall protection: Worker supported by pipe on rear of gang form moves from one bay to the bay on its right, maintaining his fall protection by moving his two safety lanyard-hooks one at a time from his left side to his right. (He has moved from left of the blue-circled point to right of it.) Photo provides close-up view of galvanized steel (gray) turnbuckle columns that slope down from left to right, that can be rotated to push/pull form face against/away from the concrete. Michigan 2006
My Construction Photos > Two reinforcing ironworkers wire lower end of cable slings to reinforcing steel mat, with upper end wired to erection/lifting beam, for crane to lift and transport mat to build cast in place reinforced concrete basement wall. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
My Construction Photos > The dark object is a structural steel plate to which steel studs/rods have been welded, which the two workers are attaching to the inside of the wall form so the studs will be embedded into the basement wall, and the face of the plate will face outward from the concrete wall. The two workers are standing on the work platform of a JLC hydraulic telescoping boom man lift. Toward us are the controls by which the workers can control travel of the lift and boom. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
My Construction Photos > In background from far right to left are (1) concrete basement walls with forms removed, (2) vertical reinforcing steel for concrete basement walls still to be cast. (3) Gang forms in place for casting basement wall, (4) vertical reinforcing steel for concrete basement walls still to be cast. Sitting away from basement walls are 3 gang forms used for basement walls. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
My Construction Photos > Concrete cast-in-place construction: Gang forms for cast-in-place (CIP) reinforced concrete deep foundation/basement walls. Gang forms are sets of large form panels attached and braced together and moved by crane from place to place to cast large sections of concrete. The vertical concrete wall at lower right was cast using the gang form in middle of photo, rotated 90 degrees. It has been lifted and rotated into its current position by the crane. It will probably be lifted and rotated to form the wall section to the immediate left of the one it recently placed. Another gang form is in place on the right wall against which the next wall section will be cast. Workers at right are finalizing the details of reinforcing steel in preparation for the form to be placed. Reinforcing steel is being erected for the far wall to follow the wall on the right. In photo center is JLG telescoping boom man lift. The orange “mushrooms” in extreme foreground are reinforcing rod caps to protect workers who might fall onto the ends of the vertical rods. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
My Construction Photos > Concrete cast-in-place construction: Gang forms for cast-in-place (CIP) reinforced concrete deep foundation/basement walls. Gang forms are sets of large form panels attached and braced together and moved by crane from place to place to cast large sections of concrete. The vertical concrete wall at lower right was cast using the gang form in middle of photo, rotated 90 degrees. It has been lifted and rotated into its current position by the crane (see boom shadow) and cables attached to its top. It will probably be lifted and rotated to form the wall section to the immediate left of the one it recently placed. Another gang form is in place on the right wall against which the next wall section will be cast. Workers at lower right are finalizing the details at bottom of reinforcing steel in preparation for the form to be placed. Reinforcing steel is being erected for the far wall to follow the wall on the right. Still another gang form in the lower right corner of photo is still in place after casting the lower right corner of the basement. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
My Construction Photos > Reinforcing ironworkers tie reinforcing steel mats together in preparation for casting the concrete foundation/basement wall. Each is tied to the steel in two places with safety hooks, lanyards, and full body harness to provide protection from falling. As they move, they alternate unhooking and hooking their hooks top always have one safety tie in position. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
My Construction Photos > Concrete Construction: reinforcing, forms, saw, shore, precast, erect photo
Crane moves concrete wall gang form into position. Visual analysis of form structure shows it is pieced together from 8 form panels. Already in place are the opposing side of the forms, reinforcing steel, and form bulkhead. The bulkhead forms a temporary construction joint, against which the next concrete will be placed, after which the bulkhead is removed so the following concrete can be placed against the last concrete placed. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
My Construction Photos > Crane moves concrete wall gang form into position. Visual analysis of form structure shows it is pieced together from 8 form panels. Already in place are the opposing side of the forms, reinforcing steel, and form bulkhead. The bulkhead forms a temporary construction joint, against which the next concrete will be placed, after which the bulkhead is removed so the following concrete can be placed against the last concrete placed. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
Crane moves concrete wall gang form into position. Visual analysis of form structure shows it is pieced together from 8 form panels. Already in place are the opposing side of the forms, reinforcing steel, and form bulkhead. The bulkhead forms a temporary construction joint, against which the next concrete will be placed, after which the bulkhead is removed so the following concrete can be placed against the last concrete placed. Ashley Terrace, Huron St, Ann Arbor, Michigan 2006
See photo in gallery

Comments

|

New comment:

Name: Email: Link:


To foil spammers, enter this code: copy this text in this box: Code unreadable?



All 2,000 large size, high resolution photos, fully captioned and keyword accessible.
Featured Galleries and Collections
Construction Favorites
Construction
Favorites
Earthmoving Slides
Earthmoving
Slides
Construction People
Construction
People
Recent Additions
Recent
Additions
Construction Hazards
Construction
Hazards
Demolition Favorites
Demolition
Favorites
ConExpo 2005
ConExpo 2005
Las Vegas
YMCA
YMCA
Broadway Bridge
Broadway Bridge
Dixboro Bridge
Dixboro Bridge
Woodrow Wilson Bridge
Woodrow Wilson
Bridge
My Construction Photos Users Guide
Site
Users Guide
Earthmoving Cut and Fill
Earthmoving
Cut / Fill
Earthmoving Excavate
Earthmoving
Excavate
Concrete Forms, Reinforcing
Concrete
Forms, Reinforcing
Concrete Mix, Place
Concrete
Mix, Place
Asphalt Pavement
Asphalt
Pavement
Demolition
Demolition
Steel Structure
Steel
Structure
Wood Framing
Wood
Framing
Construction Specialities
Specialties
Piles and Piers
Piles and Piers
Fall Protection
Safety
Fall Protection
Safety: Collapse, Impact
Safety
Collapse, Impact
Earthmoving Cut and Fill
Masonry
Brick, Block
Temporary Support
Scaffold, Shore
Temporary Support
Cranes
Cranes
Trucks
Trucks
Dinosaurs, Prehistoric Animals
Dinosaurs, Pre-
Historic Animals
Fire, Emergency Vehicles
Fire, Emergency
Vehicles
Cars
Cars and Buses
Airplanes
Airplanes
Truck Slides
Truck Slides
Boats
Boats
Trains
Trains
Old Fire Truck Slideshow
Old Fire Truck Slides
Family and Friends
Family and Friends
     


  • Example:
  • Click backhoe for all backhoe photos.
  • Click trench below backhoe for all photos showing both backhoe and trench.

 

Click below for links to other photography web sites.

Member of the Landscape Photographers List, the Architecture Photographers List, and the Digital Photographers List

Photo Top 100

Links to me?

 

You may use the photos on this site free for educational / recreational / "light" commercial use.
That is their purpose. See Use of Photos in Site User Guide


View My Stats