pile drivers, vibratory drivers, steam hammers, drilled piers, soil sampling, cranes, sheet piles, precast piles, H piles, double acting hammer, air hammer, diesel hammer, earth auger, drill, pole setting/setter, soil exploration.
Pier, foundation construction, concrete construction: Cast in place concrete pier caps/tops showing horizontal profile to support precast concrete retaining wall panels at proper elevations. The near piers have completed pier caps and have not yet been backfilled with soil. The far piers beyond these have steel pier cap forms in place to receive the pier cap concrete.Huron Parkway, Ann Arbor, Michigan 2005.
Pier, foundation construction, concrete construction: Cast in place concrete pier caps/tops showing horizontal profile to support precast concrete retaining wall panels at proper elevations. The near piers have completed pier caps and have not yet been backfilled with soil. The far piers beyond these have steel pier cap forms in place to receive the pier cap concrete.Huron Parkway, Ann Arbor, Michigan 2005.
Original size: 939px x 1500px |
Current: 282px x 450px |