pile drivers, vibratory drivers, steam hammers, drilled piers, soil sampling, cranes, sheet piles, precast piles, H piles, double acting hammer, air hammer, diesel hammer, earth auger, drill, pole setting/setter, soil exploration.
Pier, foundation construction, concrete construction: Bottom of mucking/ bailing bucket/ bit bottom was opened by worker at right, kelly bar has rotated the bucket, and bucket has spilled the loose, wet soil it removed from augered pier hole. A Bobcat skid-steer loader will clean up this cycle's leaving Huron Parkway South of Huron River, Ann Arbor, MI, 2005
Pier, foundation construction, concrete construction: Bottom of mucking/ bailing bucket/ bit bottom was opened by worker at right, kelly bar has rotated the bucket, and bucket has spilled the loose, wet soil it removed from augered pier hole. A Bobcat skid-steer loader will clean up this cycle's leaving Huron Parkway South of Huron River, Ann Arbor, MI, 2005
Original size: 1500px x 897px |
Current: 600px x 359px |