concrete: mix,transport, place, and finish
Concrete construction, placement, ready-mix: Front-chute concrete ready-mix truck backs up into position to place concrete for drilled piers that support steel soldier beams for retaining wall. Two axles of the five rear axles support the concrete, along with the front steering axle. A flag person is controlling adjacent traffic with a two-sided stop/slow sign (not shown). Huron Parkway, Ann Arbor, Michigan, August 2005.
Concrete construction, placement, ready-mix: Front-chute concrete ready-mix truck backs up into position to place concrete for drilled piers that support steel soldier beams for retaining wall. Two axles of the five rear axles support the concrete, along with the front steering axle. A flag person is controlling adjacent traffic with a two-sided stop/slow sign (not shown). Huron Parkway, Ann Arbor, Michigan, August 2005.
Camera: Canon (Canon Eos 20d) |
Original size: 1600px x 1074px |
Current: 600px x 403px |