concrete: mix,transport, place, and finish
Concrete construction, residence construction: Cast in place reinforced concrete foundation continuous footing placed in built in place dimension wood lumber side forms. Foundation for basement or lower level garage of residence, cast in bottom of excavation. Note that the bottom of the concrete is below the level of the general excavation, which allows the foundation to rest on soil that was excavated carefully so as not to disturb the soil on which the foundation rests. Concrete would have been placed by direct chute from the readymix concete truck except possibly for that at the far distance that might have been placed with cart/wheelbarrow/crane-bucket. Horizontal steel reinforcing bars were placed in the forms before the concrete was placed and provide tension strength to the concrete. The steel bars protruding from the concrete are to tie the vertical foundation wall, either cast in place concrete or concrete block masonry, to the foundation footing. Arlington Street, Ann Arbor, October 2005.
Concrete construction, residence construction: Cast in place reinforced concrete foundation continuous footing placed in built in place dimension wood lumber side forms. Foundation for basement or lower level garage of residence, cast in bottom of excavation. Note that the bottom of the concrete is below the level of the general excavation, which allows the foundation to rest on soil that was excavated carefully so as not to disturb the soil on which the foundation rests. Concrete would have been placed by direct chute from the readymix concete truck except possibly for that at the far distance that might have been placed with cart/wheelbarrow/crane-bucket. Horizontal steel reinforcing bars were placed in the forms before the concrete was placed and provide tension strength to the concrete. The steel bars protruding from the concrete are to tie the vertical foundation wall, either cast in place concrete or concrete block masonry, to the foundation footing. Arlington Street, Ann Arbor, October 2005.
Camera: Canon (Canon Eos 5d) |
Original size: 1700px x 840px |
Current: 800px x 395px |